July 1945 Tower Log Entries
306th Bomb Group--Thurleigh, England

Tower Logs were maintained in the Control Tower for every day of operations during the war. Valuable information regarding weather, general field conditions, and mission takeoff and landing details are included. The logs have been scanned one day at a time (see below). Click on a date below to download a pdf of the pages in the Tower Log for the date desired.

1 July 1945 2 July 1945 3 July 1945 4 July 1945 5 July 1945
6 July 1945 7 July 1945 8 July 1945 9 July 1945 10 July 1945
15 July 1945 16 July 1945 17 July 1945 18 July 1945 19 July 1945
20 July 1945 21 July 1945 22 July 1945 23 July 1945 24 July 1945
25 July 1945 26 July 1945 27 July 1945 28 July 1945 29 July 1945
30 July 1945 31 July 1945